This year we decided it was time to do a remodel of the kitchen, flooring, baseboards and paint.
Here is a look at our kitchen before their remodel
Kitchen with counter and original tile
Living room with carpet, old paint. The old window coverings removed
All appliances moved into the living room and plastic sheeting put up to keep the dust of the demo out of the living area.
Demo completed. No more cabinets, countertops, or sink.
Countertop and breakfast bar taken out
New water line box and connection for the refrigerator
Top set of cabinets installed, now we are getting somewhere.
Another view of the first set of cabinets installed. Also, behind the wall the gas line for the stove was tapped for a line to the porch for a natural gas grill connection.
Cabinets being assembled outside before installation.
Under the new sink with new pipes and In-Sink-Erator
First countertop going in, we chose the square edge.
New cabinets, sink, and countertop installed in front of the window.
New breakfast bar installed with a new countertop. It is lowered to make it easier to prep food,and sit to eat.
The backspash team began and first started installing the incorrect color of the backsplash
Correct blue and grey backsplash installed
Backsplash fully installed
Living room floor carpet taken out ready for the new floor installation
Hallway and master bedroom carpet removed
Carpet removed from the steps leading into the house
Carpet outside ready to be taken away
Flooring plank ready to be installed
New flooring installed in the living room. We took the opportunity to paint the walls before the flooring and new baseboards were installed.
Flooring installed in the hallway leading into the bedroom
Flooring installed in the living room in front of the hearth
New flooring installed on the steps, this took some work, and we love how it turned out. Sara also sanded and painted the railing.